Trane KIT18110

Trane KIT18110 OEM nadograđeni komplet upravljačke ploče peći - uputstvo za upotrebu

Model: KIT18110

Uvod

This manual provides detailed instructions for the installation, operation, and maintenance of the Trane KIT18110 OEM Upgraded Furnace Control Board Kit. This kit is designed as an American Standard / Trane OEM component for furnace units built after 1995. It includes the control board (CNT07541), ignitor, wire harness, and bracket.

Važna napomena: For downflow units built in 1999 and earlier, use KIT18109. For all other units built after 1995, use KIT18110.

Sigurnosne informacije

UPOZORENJE: Installation and servicing of heating, ventilation, and air conditioning (HVAC) equipment can be hazardous due to system pressure, electrical components, and equipment location. Only trained and qualified service personnel should install, repair, or service HVAC equipment.

Sadržaj paketa

The Trane KIT18110 kit typically includes the following components:

Trane KIT18110 Furnace Control Board Kit components

Image: The Trane KIT18110 furnace control board kit, showing the main circuit board, ignitor, and mounting hardware.

Kompatibilnost

This kit is an OEM replacement for various American Standard and Trane units built after 1995. It supersedes several older control board models. Always verify compatibility with your specific furnace model before installation.

Replaces / Supersedes Part Numbers:

Commonly Found in Models:

This kit is commonly found in the following A/TDX and A/TUX Gas Furnace Models:

Trane OEM Component stamp

Slika: A stamp indicating "Trane OEM Component," signifying genuine parts.

Instalacija / Podešavanje

This procedure is intended for qualified technicians. Refer to your furnace's specific service manual for detailed wiring diagrams and safety precautions.

  1. Isključivanje struje: Locate the main power switch for your furnace and turn it OFF. Additionally, turn off power at the circuit breaker or fuse box. Verify power is off using a voltage metar.
  2. Ploča za kontrolu pristupa: Open the furnace access panel to expose the existing control board.
  3. Ožičenje dokumenata: Before disconnecting any wires, take clear photographs of all existing wiring connections to the old control board. Label wires if necessary to ensure correct re-connection.
  4. Odspojite žice: Carefully disconnect all wires from the old control board.
  5. Uklonite staru ploču: Unscrew or unclip the old control board from its mounting location.
  6. Instalirajte novu ploču: Mount the new Trane KIT18110 control board using the provided bracket and screws. Ensure it is securely fastened.
  7. Povežite ožičenje: Refer to your photographs and the wiring diagram in your furnace manual to connect all wires to the new control board. Pay close attention to terminal markings (e.g., R, W, Y, G, C).
  8. Install Ignitor: Replace the old ignitor with the new one provided in the kit, ensuring proper seating and connection to the control board via the wire harness.
  9. Sigurne ploče: Zatvorite i osigurajte sve pristupne ploče peći.
  10. Vrati snagu: Restore power to the furnace at the circuit breaker or fuse box, then turn on the main power switch for the furnace.
  11. Probni rad: Initiate a heating cycle to verify proper furnace operation, including ignition, fan operation, and temperature control. Observe for any error codes or unusual behavior.

Operacija

The Trane KIT18110 control board is an integrated furnace control that manages the sequence of operation for your furnace. Once correctly installed, it will automatically control the ignition, fan, and safety functions based on signals from the thermostat and internal sensors. No direct user interaction with the control board is required for normal operation.

Refer to your furnace's user manual for instructions on setting your thermostat and general furnace operation.

Održavanje

The control board itself typically requires no routine maintenance. However, regular maintenance of your furnace system is crucial for its longevity and efficient operation. This includes:

Always disconnect power before performing any maintenance on the furnace.

Rješavanje problema

The control board features diagnostic LED indicators that can help identify system faults. Consult your furnace's service manual for a detailed list of error codes and their meanings. Common issues and initial checks include:

If you are unable to resolve an issue, contact a qualified HVAC technician.

Specifikacije

Broj modela stavkeKIT18110
ProizvođačTrane
KompatibilnostAmerican Standard / Trane units built after 1995
Kit IncludesControl Board (CNT07541), Ignitor, Wire Harness, Bracket
Dimenzije paketa12.09 x 7.2 x 5.08 inča
Težina artikla15.17 unce

Informacije o garanciji

Specific warranty details for the Trane KIT18110 control board kit are typically provided by the point of purchase or Trane directly. It is recommended to retain your purchase receipt and consult the official Trane warranty documentation for your specific product. Generally, OEM parts carry a limited warranty against manufacturing defects.

Podrška

For technical assistance, troubleshooting beyond this manual, or warranty claims, please contact your authorized Trane dealer or a qualified HVAC service professional. You may also visit the official Trane webstranica za dodatne resurse i kontakt informacije.

Povezani dokumenti - KIT18110

Preview Trane & American Standard Priručnik za instalaciju, rad i održavanje plinske peći serije S8
Sveobuhvatni vodič za instalaciju, rad i održavanje plinskih kotlova 1-S marke Trane i American Standard S8 serije s uzlaznim/spustnim/horizontalnim protokom.tage i 2-StagPeći s indukcijom i visokoučinkovitim motorom. Uključuje sigurnosna upozorenja, specifikacije, dijagrame ožičenja i rješavanje problema.
Preview Trane S9V2 serija plinskih peći: Priručnik za instalaciju, rad i održavanje
Sveobuhvatan vodič za instalaciju, rad i održavanje Trane i American Standard S9V2 serije 2-stage kondenzacijske plinske peći s promjenjivom brzinom. Obuhvata sigurnost, postupke instalacije, specifikacije i rješavanje problema.
Preview Servisni bilten o kvarovima IFC ploče kompanije Trane & American Standard - OBAVEZNA prerada
Službeni servisni bilten kompanija Trane i American Standard u vezi s kvarovima ploče integrirane kontrole peći (IFC) u određenim modelima peći. Detalji o kodu greške 5, pogođenim modelima i obaveznim uputama za ponovni rad.
Preview Priručnik za instalaciju, rad i održavanje plinskih peći Trane/American Standard serije A801X
Ovaj sveobuhvatni priručnik pruža detaljne upute za instalaciju, rad i održavanje pojedinačnih pumpi serije Trane i American Standard A801X.tage plinske peći s induciranom promajom. Obuhvata sigurnosna upozorenja, specifikacije proizvoda, smjernice za instalaciju, postupke rješavanja problema i periodične zahtjeve za servisiranje različitih modela.
Preview Upute za instalaciju Trane LP kompleta za konverziju za Precedent krovne jedinice
Detaljne upute za instalaciju za pretvaranje Trane Precedent™ paketnih krovnih jedinica (6 do 25 tona) s prirodnog plina na propan (LP). Uključuje sigurnosna upozorenja, popis dijelova i detaljne postupke za kvalificirano osoblje.
Preview Trane Ultra-Low NOx serija - Vodič za instalaciju paketnih plinskih grijaćih/električnih rashladnih jedinica
This installer's guide provides comprehensive instructions for the installation, operation, maintenance, and troubleshooting of Trane Ultra-Low NOx Series single packaged gas heating and electric cooling units (2-5 Ton). It covers safety, requirements, electrical, gas, startup, and component details.